Start with eight groups of information:
Label each point as confirmed, preferred or open to factory recommendation. This prevents an early preference from being treated as a final specification.
Provide the context that can change the product or documents:
The factory does not need your full business plan. It needs enough context to avoid proposing the wrong construction, packaging or testing route.
Send clear references from several angles. If the design is confidential, begin with a simplified brief and release detailed files after the supplier passes an initial review.
Useful inputs include:
Identify whether the reference is a shape reference, a quality benchmark, a color reference or only a general style direction. A supplier should not assume that every visible feature must be copied.
Describe the main components and how they should work together.
| Construction point | Questions to answer |
|---|---|
| Overall build | One-piece molded, assembled or mixed construction? |
| Upper | Fixed band, adjustable component, molded upper or another structure? |
| Footbed | Flat, contoured, textured, cushioned or support-focused? |
| Outsole | One material or separate outsole? What traction pattern or use surface? |
| Edge and finish | Rounded, defined, matte, glossy, textured or mixed? |
| Drainage or ventilation | Required, optional or not applicable? |
| Weight and flexibility | What user experience is preferred? Which point is most important? |
If the factory should recommend the construction, state the desired result and use condition rather than inventing technical details.
PU is a broad material category. Give the factory the performance and appearance priorities that matter to the buyer:
Ask the supplier to state its proposed material route and any trade-offs. Do not rely on a general label such as premium PU without a project reference or measurable approval method.
For more detail, read How to Choose PU Material for Custom Slide Sandals.
For each color, specify:
For branding, provide:
Do not ask the supplier to guess the final logo from a low-resolution screenshot. Read How to Choose Embossed, Printed or Molded Branding for process selection.
State the intended market size system and the source of the fit reference:
Size conversion alone does not guarantee fit. Open-toe slides also require review of footbed length, width, toe and heel position, upper placement and retention.
List every item that should be included in the quotation:
Separate required packaging from optional concepts. Packaging can change unit cost, volume, damage risk and production work. Use our Packaging and Labeling Checklist to prepare the details.
Share an honest range rather than an artificial exact number when volume is still being validated:
Ask about flexible MOQ options after the supplier understands the number of molds, colors, materials, sizes and packaging combinations. MOQ is a production condition, not a single number that applies to every design.
Tell the factory what must be proven and who defines the requirement:
Use current destination-market and product-specific requirements. Do not request a generic compliance certificate without confirming whether it covers the material, product, market and production site.
Use the following structure in an email or attachment:
Create a comparison sheet with the same rows for every supplier. Mark missing information instead of guessing it.
| Comparison area | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Construction assumption | |||
| PU material proposal | |||
| Logo and colors included | |||
| Size range included | |||
| Packaging included | |||
| Tooling or development items | |||
| Testing and inspection | |||
| MOQ basis | |||
| Project timing assumptions | |||
| Commercial terms | |||
| Open questions |
The comparison is complete only when the important assumptions are aligned.
Henghao Shoes reviews custom PU slide projects around construction, PU material direction, branding, color, sizing, packaging, destination requirements and expected project scale. If information is missing, the project team can identify the points that need buyer confirmation and the points where a factory recommendation is appropriate.
Flexible MOQ options and project timing are discussed according to the approved design route, materials, tooling, size run, packaging and production conditions. They are not treated as fixed promises for every inquiry.
A photo can support an initial estimate. A comparable quotation needs assumptions for construction, material, colors, logo, sizes, packaging, order range and quality requirements.
Describe the intended use, feel, appearance and performance priorities. Ask the factory to recommend a material route and explain how it will be approved.
It can help a supplier avoid proposing an unsuitable construction, but the decision depends on your purchasing method. If shared, pair the target with clear quality and product requirements so it does not become the only objective.
The approved sample may change materials, construction, tooling, logo, packaging or process requirements. The supplier should explain which approved change caused the price update.
Only when the quoted scope, quality assumptions, responsibilities and commercial terms are comparable. An incomplete low quotation can become more expensive after missing items are added.
More buyer questions: Visit the Custom PU Slide Sandals Buyer Help Center.
This checklist is editorial buyer guidance based on the information normally required to define a custom footwear project. It does not set universal technical, legal or compliance requirements. Buyers and suppliers should confirm the actual product specification, destination rules, commercial terms and responsibilities for each order.
To request a project review, contact Henghao Shoes and send the completed sections of this checklist. Unknown items can remain open for discussion.